How is it calculated?
Volume = length × width × thickness. Waste allowance covers formwork and site tolerances.
Example
A 5 × 4 m slab at 12 cm thickness requires 2.4 m³ theoretically.
What questions does this tool answer?
- How many cubic metres of concrete do I need?
- How is Concrete Volume calculated?
- What inputs are needed for Concrete Volume?